Cascais Airport's Terminal Building

Cascais Airport
Cascais Airport
Cascais Airport

The building, with a deployment area of 961.00 m2, has a gross floor area of 1.526 m2, distributed over 2 above ground-level floors, and is sized for an average of 80 passengers per day, distributed by regular and business class flights.

Most of the public areas are located on the ground floor, while the upper floor houses most of the work and support areas (although for functional reasons some of the operational areas were located on the ground floor). The technical areas, in turn, are divided by both floors.

Thus, on the ground floor are located the spaces for VIP and regular passengers, cafeteria and its kitchen, SEF [Portuguese immigration and borders service], PSP [national civil police force], Customs, and Control and Security Area, including screening area of hand and hold luggage. The upper floor includes the core of work offices and support areas for employees, areas for pilots and other crew members, VIP meeting rooms, and service and BackOffice areas for operators.

The Design, developed with BIM (Building lnformation Modeling) methodology, includes the following specialties:

  • Architecture;
  • Accessibility Plan;
  • Foundations and Structures;
  • Facilities and equipment for drinking and firefighting water;
  • Wastewater and stormwater drainage facilities and equipment; Electrical facilities and equipment;
  • Electromechanical facilities and equipment (lifts); Telecommunications facilities and equipment (voice and data); Ambient sound, public address and evacuation facilities; Integrated Fire Safety in Buildings (SCIE);
  • HVAC + BMS installations;
  • Thermal behaviour study, verification of the Regulation on the energy performance of residential buildings (REH): Energy Pre-Certification (PCE);
  • Acoustic conditioning studies; Health and Safety Plan;
  • Waste prevention and management plan (PPGR);

Assignment

The provision of services included the development of the said designs in the phases of Preliminary Design, Licensing Design, Detailed Design and Technical Assistance during construction.

Download PDF

Date

2020 - 2021

Country

Client

Câmara Municipal de Cascais

Companies

TPF Consultores

Sectors

Share this Project

Share this Project