The contract concerns the execution of a "pre boarding"área and the change of the passenger screening area of the floor 0 to the floor -1.
The works include:
- Running a metal purlins structure IPE220, with spans of 10m supported by steel frames made of pillars and beams type HEA 220. The foundations are of type micropiles with about 8 m of depth;
- Repositioning of boarding counters on floor 0, including all existing infrastructure and repairs to damaged floors; Removal of x-ray machines 0 floor to floor -1;
- Execution of the passenger access corridor floor 0 to -1 floor;
- Construction of the future retail area at floor level 0, including the demolition of screening area of goods and staff;
- Delivery and implementation of escalators;
- Relocation of existing HVAC equipment, including connection of all necessary infrastructures to ensure the operation of commercial spaces;
- Passenger traffic corridor on level -1 and new passenger screening area;
- Implementation of revised cabins, supervision offices, technical areas, supervision area, and toilet facilities;
- Construction of the new Reserve Area;
- Repositioning of safety signs, escape routes, updating and implementation of Emergency Plans
Assignment
Construction Works Supervision
Analysis and follow-up of requests for Work Permits submitted by contractors