This contract includes the construction of two tunnels, the tunnel Monsanto-Santa Apolónia (TMSA) and the tunnel Chelas-Beato (TCB), aiming at creating two independent drainage systems in Lisbon, able to respond effectively and in a structured way to the needs of stormwater drainage.
These infrastructures will be constructed by a Tunnel-boring machine (TBM).
There are several works related to both tunnels, which are listed and briefly described below:
Tunnel (TMSA); Diversion work from the Alcântara Channel to the water intake work (TM1); Diversion work and intersection at Avenida da Liberdade (TM2); Diversion work and intersection at Santa Marta (TM3); Diversion work and intersection at Avenida Almirante Reis (TM4); Outlet work at Santa Apolónia (TM5); Domestic Wastewater and Stormwater drainage systems at the lowest area of Santa Apolónia drainage basin, in the surrounding area to the outlet area of TMSA (TM6).
Tunnel (TsCB); Diversion work from the Chelas Channel to the water intake work (does not fall under the scope of this contract); Outlet work in Doca do Poço Bispo area; Domestic Wastewater and Stormwater drainage systems intecepted by the TCB outlet work.
Supervision, Site safety coordination, quality management, environmental management, and risk management of works.
2021 - ONGOING
Direção Municipal de Manutenção e Conservação da Câmara Municipal de Lisboa
TPF Consultores