The intervention took place in a 600 meters long stretch with a transversal section of 9 meters. The height at maximum flood level being 2 meters. The project included: A boundary wall on the left bank, part in Cyclops concrete, part in standard concrete, the regularization of the right bank and bottom of the river and the construction of a road for heavy trucks traffic with a total length of 390 m and a transversal section with 0,80 meters sidewalks and two traffic lanes each with 3,5 meters width.
Detail Design
Tender Process
2003 - 2004
APRAM - Administração dos Portos da Região Autónoma da Madeira
TPF Consultores