Casais Wind Farm

Casais Wind Farm
Casais Wind Farm
Casais Wind Farm

Casais Wind Farm, located in the Montemuro Mountain consists of 1 wind turbines with 2.3 MW of unit power and a total installed power of 2.3 MW and the construction of a substation and control building.

The connection of the park to the power grid is made through a 15 kV power line with a length of 4,5 km that connects to Castelo de Paiva Substation.

The environmental studies included:

  • Characterization of the reference situation in order to identify and limit archaeological and ecological sensitive areas, which could condition the establishment of the wind farm;
  • Identification, forecast and assessment of potential impacts, positive or negative, arising from the implementation of the wind farm, immediate or long term, during the construction, exploration and decommissioning phases;
  • Definition of a set of measures capable of minimizing the identified potential negative impacts.

Environmental and Archaeological Monitoring was carried out during the construction phase and Environmental Monitoring during the initial exploration phase.

Assignment

Environmental Impact Study

Preliminary Environmental Analysis of Areas for Wind Farm Expansion

Detail Design Environmental Conformity Report (RECAPE)

Environmental and Archaeological Monitoring during construction phase

Environmental Monitoring, in the Initial Exploration Phase, of Avifauna, Flora and Vegetation