Casais Wind Farm, located in the Montemuro Mountain consists of 1 wind turbines with 2.3 MW of unit power and a total installed power of 2.3 MW and the construction of a substation and control building.
The connection of the park to the power grid is made through a 15 kV power line with a length of 4,5 km that connects to Castelo de Paiva Substation.
The environmental studies included:
Environmental and Archaeological Monitoring was carried out during the construction phase and Environmental Monitoring during the initial exploration phase.
Environmental Impact Study
Preliminary Environmental Analysis of Areas for Wind Farm Expansion
Detail Design Environmental Conformity Report (RECAPE)
Environmental and Archaeological Monitoring during construction phase
Environmental Monitoring, in the Initial Exploration Phase, of Avifauna, Flora and Vegetation
2005 - 2010
Eólica de Tendais, Empreendimentos Eólicos
TPF Consultores