The works include the construction of the new railway line, over a 185 km stretch on a single track, between Relizane, Tiaret and Tissemsilt.
The new line is built in the perspective of future developments, with bridges, drainage works and tunnels with a double track profile.
The future electrification of the railway line is also planned.
The new line is intended for mixed traffic (passengers and goods) and can reach a maximum speed of 160 km/h.
The project includes:
Detail Design Review
Construction Works Supervision
936 M€
2011 - ONGOING
ANESRIF - Agence Nationale d’Etudes et de Suivi des Réalisations Ferroviaires
TPF Consultores
GETINSA