Final Designs of 13 railway viaducts related to the duplication of the railway track with rectification of the track alignment between the stations of El Affroun - Khemis Miliana (55 km) of the Algiers/Oran Line, in Algeria.
It is a ballasted double-track, of mixed traffic, for passengers and goods transportation, with project speeds of 160 km/h and 100 km/h respectively, over an extension of 55 km, integrating several viaducts and tunnels.
The 13 special engineering structures have widths of 8.8, 12.8 and 13.3 m and lengths ranging between 27 m and 568 m.
As a main solution, a design of decks with isostatic spans was adopted, composed of prefabricated beams, pre-stressed by post-tensioning, with a 37m span, in order to minimize the use of expansion devices.
Detail Design
Technical Assistance to the Contractor
2012 - 2016
CHINA CIVIL ENGINEERING CONSTRUCTION CORPORATION
TPF Consultores
PC&A