The Hydroelectric Exploitation consists of: a dam, a water outlet, a gallery, a hydroelectric power station and a return channel.
The water intakes made up of a test of 30 m, which follows a convergent channel to transition well to the gallery.
The Gallery of deriving concrete lined, has a diameter of4 m and a length of 400 m. The refund of rectangular cross-section channel with 12 m wide has a length of 150 m.
The hydroelectric power station equipped with two turbines Kaplan type has a maximum power of 2820 kW, for a 39 unit flowm3/s and a maximum gross fall of 9 m.
Preliminary Design
Detail Design
1991 - 1992
Hidroeléctrica do Casal, Lda
TPF Consultores