The Bustelo/Cinfães Wind Farm, located in Montemuro Mountain, consists of 13 wind turbines with 2 MW of unit power and a total installed power of 26 MW and the construction of two substations and control buildings, distributed by the Cinfães Wind Farm (4 wind turbines) and the Bustelo Wind Farm (the remaining 9 wind turbines).
In turn, the Bustelo park is divided into 2 cores: Zone I (7 wind turbines) and Zone II (2 wind turbines).
The connection of the Park to the power grid is carried out through existing electric lines.
The environmental studies included:
Environmental Monitoring was carried out during the pre-construction and construction phases and in the initial exploration phase.
Environmental Impact Study
Detail Design Environmental Conformity Report (RECAPE)
Environmental Monitoring of the Construction Works
Environmental Monitoring of the Initial Exploration Phase of Avifauna, Flora, Iberian Wolf, Chiropteran, Vegetation and Noise
2007 - 2012
ENEOP2 – Exploração de Parques Eólicos
TPF Consultores