Mendoiro-Bustavade Wind Farm, located in Alto Minho consists of 26 wind turbines with 2 MW of unit power and a total installed power of 52 MW and the construction of a substation and control building.
The connection of the park to the power grid is made through a 150 kV power line with a length of 52 km that connects Mendoiro-Bustavade Substation to Pedralva Substation.
The environmental studies included:
Environmental Monitoring was carried out during the construction phase and during the initial exploration phase.
Environmental Impact Study
Detail Design Environmental Conformity Report (RECAPE)
Environmental Monitoring of Avifauna during the Initial Phase of Exploitation.
2002 - 2011
Empreendimentos Eólicos do Vale do Minho / Vento Minho, Energias Renováveis
TPF Consultores