São Macário II Wind Farm, located in Montemuro Mountain consists of 10 wind turbines with 2300 kW of unit power and a total installed power of 23 MW and the construction of a substation and control building.
The connection of the park to the power grid is made through a 60 kV power line with a length of 4,9 km that connects to Carrapatelo Substation.
The environmental studies included:
Environmental Monitoring was carried out during the initial exploration phase.
Environmental Impact Study
Detail Design Environmental Conformity Report (RECAPE)
Environmental Monitoring of Avifauna during the Initial Phase of Exploitation.
2006 - 2011
Alto Marão, Energia Eólica / Ventos Propícios – Energia Eólica
TPF Consultores