São Macário II Wind Farm

São Macário II Wind Farm
São Macário II Wind Farm
São Macário II Wind Farm

São Macário II Wind Farm, located in Montemuro Mountain consists of 10 wind turbines with 2300 kW of unit power and a total installed power of 23 MW and the construction of a substation and control building.

The connection of the park to the power grid is made through a 60 kV power line with a length of 4,9 km that connects to Carrapatelo Substation.

The environmental studies included:

  • Characterization of the reference situation in order to identify and limit archaeological and ecological sensitive areas, which could condition the establishment of the wind farm;
  • Identification, forecast and assessment of potential impacts, positive or negative, arising from the implementation of the wind farm, immediate or long term, during the construction, exploration and decommissioning phases;
  • Definition of a set of measures capable of minimizing the identified potential negative impacts.

Environmental Monitoring was carried out during the initial exploration phase.

Assignment

Environmental Impact Study

Detail Design Environmental Conformity Report (RECAPE)

Environmental Monitoring of Avifauna during the Initial Phase of Exploitation.

Download PDF

Date

2006 - 2011