Tendais Wind Farm, located in Viseu, consists of 6 wind turbines with 2 MW of unit power and a total installed power of 12 MW.

The connection of the Wind Farm to the power grid is carried out through a 15 kV electric line with a 13 km extension that connects at the Castelo de Paiva substation.

The environmental studies included:

  • Characterization of the reference situation in order to identify and limit archaeological and ecological sensitive areas, which could condition the establishment of the wind farm;
  • Identification, forecast and assessment of potential impacts, positive or negative, arising from the implementation of the wind farm, immediate or long term, during the construction, exploration and decommissioning phases;
  • Definition of a set of measures capable of minimizing the identified potential negative impacts.

Environmental and Archaeological Monitoring was carried out during the construction phase and Environmental Monitoring during the initial exploration phase.

Assignment

Environmental Assessment Studies (Wind Farm Expansion)

Environmental Impact Study

Environmental and Archaeological Monitoring during the construction phase

Environmental Monitoring, in the Initial Exploration Phase, of Avifauna, Flora, Vegetation and Chiropteran

Download PDF

Date

2005 - 2011

Country

Client

ENERBIGORNE – Projectos de Energia

Companies

TPF Consultores