East Mining Line - Annaba / Djebel Onk. Lot 3

East Mining Line - Annaba / Djebel Onk. Lot 3
East Mining Line - Annaba / Djebel Onk. Lot 3
East Mining Line - Annaba / Djebel Onk. Lot 3

The renewal of the railroad for Lot 3 of the Annaba / Djebel Onk Mining Line includes 6 sections, covering a total length of 358.72 km:

  • Souk-Ahras /Ghardimaoo (53,5 km);
  • Souk-Ahras/Kouif (28,35+72,02 km);
  • Tebessa/Djebel Onk (28,35+85 km);
  • Annaba / Tunisian border (48,39 km);
  • Oued-Keberit / Ouenza (24,59 km);
  • Chenia / Boukhadra (18,52 km).

Ore transport trains make up the bulk of the traffic (around 2 000 t / train).

The work consists of replacing the track superstructure (ballast, sleepers, rail and track-side equipment), with the aim of improving circulation conditions and, consequently, increasing the transport of the iron mines in Ouenza and Boukhadra and from the mine of phosphates, in Djebel Onk, to the Port of Annaba.

Assignment

Design Review

Construction Works Supervision

Download PDF

Work's Value

90 M€

Date

2008 - 2021

Country

Client

ANESRIF - Agence Nationale d’Etudes et de Suivi des Réalisations Ferroviaires

Companies

TPF Consultores

GETINSA, SIDEM

Sectors

Share this Project

Share this Project