The Bini A Warak Hydroelectric Development consists of a concrete gravity dam and embankment, with a height of 37 m and a crest of 1179 m, dominating a reservoir of 771 million m3.
With a 75 MW power station installed (3 vertical turbines Francis of 25 MW), a rated flow of 41.7 m3/s and a power head of 206 m, it also includes a 225 kV power line of 50 km linking to the new Wuro-soa Substation, and the intervention in 19,865 km of permanent roads and 23,65 km of temporary roads in the project area, including two 40 m bridges and one 130 m bridge.
This Development was funded by the International and Commercial Bank of China (ICBC).
Legal, Regulatory, Normative and Technical Assistance to the Client in the design phase
Design Review
Construction Works Supervision
Technical Assistance to the Client in the Early Operation Phase
Training of Technical Staff during the Design, Construction and Operation Phases
277 M€
2016 - ONGOING
Ministério da Energia e Recursos Hídricos
TPF Consultores
INTERTECHNE