The Pre-feasibility Study for Electrification of several settlements was divided into 3 Lots:
- Lot 1 - Luângua small hydro plant, for the settlements of Micuinha and Lochesse;
- Lot 2 - Luchimua small hydro plant, for the settlements of Ntimbe and Munhehere;
- Lot 3 - Meponda small hydro plant, for the settlements of Meponda and Machele.
Each lot included the following elements:
- Complete hydrological study of the hydrographic basins of the Luângua, Luchimua and Litombochi rivers;
- Socio-economic survey to assess the electricity needs of each settlement to serve;
- Geological and Geotechnical Studies of the construction sites;
- Preliminary study of the small hydro plants constituent parts.
Assignment