Construction of the Beira Interior Motorway (Motorway that connects the centre of Portugal to the Spanish border), this project comprises two stretches: Stretch Mouriscas / Gardete and Castelo Branco / Gardete, establishing the connection with the IP6 (Stretch Abrantes/Mouriscas) and with the Stretch Castelo Branco Norte / Soalheira. The works included:
Stretch Mouriscas / Gardete
Construction of the four lanes Motorway, with an extension of 28.3 km, including 4 knots, 40 reestablishments, 5 viaducts and one bridge, Viaduct of Rio Frio with an extension of 228 m and maximum heigth of pillars of 35 m, Viaduct of Boas Eiras, extension of 215 m, maximum heigth of pillars of 63 m, Viaduct Eiras, extension of 369 m, maximum heigth of pillars of 12,4 m,Viaduct of Avessada, extension of 390 m, maximum heigth of pillars of 101 m.
Stretch Castelo Branco /Gardete
Construction of the four lanes Motorway, with an extension of 46.7 km, including 8, knots and 44 reestablishments, 4 viaducts (of which the Viaduct of Perdigão is 600 m long, and has a maximum height of pillars of 60 m), and one bridge.
Construction Works Supervision
400 M€
2000 - 2003
SCUTVIAS - Autoestrada da Beira Interior, S.A.
TPF Consultores
GAPROBRA