The project of the Hydraulic Circuit of Pedrogão benefits of a total area of 24,000 ha of which 5180 ha were projected, encompassing:
- Main Pumping Station of Pedrogão (H = 78 m, Q = 12.55 m3 / s) and Conduct Pumping (1800 m long, DN2500);
- Pedrogão reservoir, with a volume of 145 dam3;
- Gravity Adduction Circuit, with 28 km, includes a section on canal with 1.75 km and conduct in several sections with different diameters (DN400 to DN2500), maximum flow rate of 11.45 m3 / s;
- Dam of San Pedro, reservoir of 10 hm3 and dam height of 24 m;
- Pumping Station-of Selmes EE2 with two levels (EE2.1 H m = 70, Q = 0.55 m3 / s; EE2.2 H m = 90, Q = 1.36 m3 / s);
- Selmes reservoir with a storage volume of 25 dam3;
- Pedrogão pumping station 3 (H = 80.9 m, Q = 12,50 m3 / s);
- Pedrogão Pumping Station 1 (H = 116.5 m, Q = 0.11 m3 / s);
- Network Secondary Irrigation;
- Cleaning and reprofiling 6.4 km of watercourses;
- Construction and rehabilitation of 13.39 kilometers of agricultural roads;
- Remote Management System, Automation and Monitoring
Assignment
Base Design
Detail Design
Geographic Information System
Environmental Impact Study
Technical Assistance to Construction Works