Calueque region has great agroecological potential for the development of irrigated agriculture, with a widespread expansion of this activity currently occurring along Calueque's channel.
Although Cunene River has an important water source, the hydraulic system built is not prepared to meet the demands of farmers in the region, simultaneously with the flow needs on the other side of the border.
Studies and designs were prepared, within the scope of a design-construction invitation to tender, for two solutions that contemplate the establishment of an irrigation perimeter, originating in Calueque channel, to be implemented in two phases, each with 2,000 ha, including:
Base Project
2009 - 2010
Consórcio EDIFER Construções & OIKOS Construções
TPF Consultores
ProSistemas Angola