This website uses cookies by default. These cookies are intended to optimize your browsing experience on this website. By browsing the site you will consent to its use. Please see our Terms of Use and Privacy for more information.
Studies and projects of the geometry of the layout, earthwork, drainage, paving, ancillary works, signaling, safety equipment, engineering works, integrated supervision and management systems of tunnels and landscape integration;
The total length of the current section is 4.0 km (approx.), 1.7 km of which develops into tunnel.
Reformulation of interchanges of Buraca (IC19) and Pontinha (IC16), partially in use.
Links with Damaia, Portas de Benfica, Benfica round about and replacement of affected roads to ensure the restoration of urban road network and provide access to the surrounding areas to the IC17, as well as a section of the IC16, representing a total of about 14 km of new roads.
Assignment
General Coordination and preparation of Detail and Base Design of the General Works - Design, Dimensioning and Technical Assistance during the Construction Phase