This contract, financed by the European Structural Funds (Regional Operational Program 2007-2013 Priority Axis 2), included:
- Rehabilitation of the road network and modernization of 5 200 m of urban roads;
- Rehabilitation of an extension of 13 700 m of sidewalks;
- Drainage trenches over an area of 10 400 m;
- Modernization and expansion of utility networks (sanitation) in 2 roads, including rainwater drainage system, collector, retention basin and pumping station;
- Fences, green areas, , access facilities for people with reduced mobility, road signs, refuge areas, drainage trenches, environmental protection facilities on all rehabilitated / modernized streets.
Assignment
Construction Works Supervision