The extension of the Rato - Cais do Sodré Yellow Line aims to better serve the southern part of the network and of Lisbon. It extends in a N-S corridor, connecting Marquês de Pombal and the Riverside area of Lisbon at Cais do Sodré from the Yellow Line Rato Terminal. 

This extension will be in double track tunnel, with a length of 1984m. It will have 2 new stations with 105m long side platforms and 2 new middle-section Ventilation Shafts.

It is planned to create a second west hall, complementary to the current one from Cais do Sodré Station with a new link between the ML platform in the west area of the current station and the 3 CP railway platforms. This extension includes the remodelling of the current Ventilation Shaft, which is at the end of the Rato Terminal, that will undergo adaptations inside to guarantee access to the new tunnel as well.  It is also planned to connect the lines to the North, in Campo Grande, with the creation of 2 new connection sections between the existing viaducts, which will allow the ring connection of the Green Line coming from Alvalade with the section of the Cidade Universitária of the Yellow Line, and also a connection between the Telheiras and Quinta das Conchas Stations of the current Yellow Line. This solution to connect the two Yellow and Green Lines will allow the ring closure, which will become a circular line, in order to improve mobility in the central area of the city of Lisbon.

The review of the Base Design and the Detailed Design focuses on the following disciplines:

  • Excavation and Retaining Walls;
  • Structures and Construction Methods; 
  • Provisional or Definitive Retaining Structures;
  • Tunnels (Structures and Construction Methods);
  • Retaining Structures along the Geometric Design (Retaining Walls, Stabilisation and Containment of Slopes);
  • Demolitions (Buildings and other Infrastructures Interfered by the Geometric Design);
  • Interferences (Survey of the State of the Built Heritage along the Geometric Design and Risk Analysis);
  • Preparation of Risk Scenarios, Observation Plans and Monitoring/Instrumentation Designs;
  • Reinforcement Structures for Buildings along the Geometric Design (Consolidation of Foundations);
  • Traffic Diversions;
  • Affected Utilities (Infrastructure Records);
  • Geology/Geotechnics;
  • Hydrology;
  • Design for the Integration of the Extension in the existing Metro Infrastructure and Systems;
  • Design of the infrastructures embedded in the reinforced concrete structure (water and drainage pipes, puddle flanges, electrical and telecommunications infrastructures, earth pits, railway crossings);
  • Openings Plan for the Technical Rooms (main LV switchboard, switching and transformer substation, traction substation, pump room);
  • Reinforced concrete design of the wastewater pumping wells;
  • Elevation plan for the lifts and escalators’ installation;
  • Openings plan for the passage and crossing of ventilation and air conditioning ducts;
  • Design of the Railway protecting Falsework;Design of the Separation Spandrels between the construction area and the operating area;
  • Construction Site Design;
  • Systematic Preventive Maintenance Plans for Infrastructure and Equipment;
  • Construction and Demolition Waste Prevention and Management Plan;
    Preliminary Report on Environmental Compliance.

Assignment

Review of the Base Design and the Detailed Design.