Algiers Metro “El Harrach Centre - Aéroport"

Algiers Metro “El Harrach Centre - Aéroport"
Algiers Metro “El Harrach Centre - Aéroport"
Algiers Metro “El Harrach Centre - Aéroport"

The section “EL Harrach Center - Aéroport International d’Alger” of the Algiers Metro has an approximate length of 10 km.

This section has 9 underground stations (7 excavated in open-cut and 2 mixed, with excavation in open-cut and underground galleries) and 10 ventilation shafts, one of them for the extraction of the tunnelling machine.

The 10 km of track tunnel, with an internal diameter of 9.3 m, are materialized using an EPB type TBM.

Assignment

Analysis of the Preliminary Design Solutions

Monitoring of the Complementary Geological-Geotechnical Survey Program

Detail Design

Technical Assistance to the Contractor

Download PDF

Date

2015 - ONGOING

Country

Client

COSIDER Travaux Publics

Companies

TPF Consultores

Ferconsult

Sectors

Share this Project

Share this Project