Borba Photovoltaic Plant

Borba Photovoltaic Plant
Borba Photovoltaic Plant
Borba Photovoltaic Plant

Borba Photovoltaic Power Station is located in Évora district, at Borba and Vila Viçosa municipalities, and has a power of 20,7 MW, with an estimated annual average electricity production of 34,2 GWh, with the transformation of solar energy into electricity, made on photovoltaic panels.

The power station is made up of 78144 PV modules installed in 387 lines, 11 inverters / transformers and 1 Substation, from which comes a 30 kV aerial power line with 6,2 km extension that connects to Borba Substation.

Environmental studies included:

  • Characterization of the reference situation in order to identify and limit archaeological and ecological sensitive areas, which could condition the establishment of the photovoltaic power station;
  • Identification, forecast and assessment of potential impacts, positive or negative, arising from the implementation of the photovoltaic power station, immediate or long term, during the construction, exploration and decommissioning phases;
  • Definition of a set of measures capable of minimizing the identified potential negative impacts.

Assignment

Environmental Assessment Study

Download PDF

Date

2018 - 2018

Country

Client

EDF EN Portugal Unipessoal, Lda

Companies

TPF Consultores

Sectors

Share this Project

Share this Project