The Project involves the execution of interventions over a total length of about 15.5 kilometres, and includes:
These interventions will increase supply on the Cintura, Northern and Sintra Lines, particularly in suburban trains, but also in the regional and long-distance ones.
The implementation of these investments will create conditions for the implementation of new High-Speed Services between Lisboa-Oriente and Porto-Campanhã.
The project provides for the following speeds (minimum values):
Environmental Impact Study, Preliminary Design; Detailed Design (Autonomous Projects) and Technical Assistance:
Studies included in the service provision scope: Topographical Surveys; Geological and Geotechnical Study and Geotechnical Prospecting, Railroad; Hydrology and Hydraulics, Earthworks, Drainage and Seals, Electric Traction Fixed Installations, Infrastructure to support the Signalling component, Infrastructure to support the Telecommunications component, Interventions in Stations and Halts, Engineering Structures – bridges and similar structures,
Demolitions; Supporting, Stabilization and Retaining Structures, if necessary; Affected Utilities; Realignment and Service Roads; Landscape Integration; Construction and Demolition Waste Prevention and Management Plan; Expropriations, Safety and Health and Technical Compilation Plan.
2022 - ONGOING
IP – Infraestruturas de Portugal, S.A.
TPF Consultores