Douro Interior Subconcession

Douro Interior Subconcession
Douro Interior Subconcession
Douro Interior Subconcession

The Strechtof the IC5-Pombal node/Nozelos (IP2) presents the following characteristics:

  • Total length of section: 24.1 km
  • Earthworks:Excavation 3200 km; Landfill 2 500 000 m3 ;
  • Single carriageway, doubled in the connecting nodes;
  • The geometry of the layout set to a speed of 90 km/h;
  • Two Connecting nodes at different levels: Carrazeda de Ansiães and Vila Flor nodes;
  • Structures: 2 viaducts, 10 Overpasses, 9 Underpasses and 8 Agricultural Passages
  • Restoration of roads, paths and connections to the surrounding areas with a 12.7 km extension
  • Lighting of Liaison Nodes and Technical Channel Road

Assignment

General Coordination and preparation of Detail and Base Design of the General Works - Design, Dimensioning and Technical Assistance during the Construction Phase

Download PDF

Work's Value

60 Milhões

Date

2009 - 2012

Country

Client

ODEBRECHT

Companies

TPF Consultores

Project Owner

EP - Estradas de Portugal, E.P.E.

Sectors