Expressway with 3600 m long, inconjunction with the Phase 1 (2400 m), connects the West and East exits ofFunchal. It presents a cross-section of 4-way of 3.25 m each, arranged in twolanes with central separator.
The section has 4 knots (knot ofWest Exit, knot of Santo Antonio, knot of Stª. Luzia, knot of Viveiros and 3 double tunnels (Tunnel João Abel deFreitas with 580 m, Tunnel of Marmeleiros with 740 m and tunnel Quinta daPalmeira 260 m), which connects to the 1st. Phase of this circular by the trainviaduct that is 200 m long.
Over the valleys of the riversthe track has 5 bridges (Ribeiro Seco Bridge com188 m, São João Bridge with 148m and Penteada bridge with 64 m).
For restoration of intersectedroads were built 3 underpasses (one of which is 267 m) and 5 overpasses.
Every track is fenced withplasticized mesh and are also included works of landscaping, lighting,security, ventilation of tunnels and regularization of Rivers of São João andSanta Luzia.
Construction Works Supervision
71 Milhões
1997 - 2000
SREST (Secretaria Regional do Equipamento Social e Transportes)
TPF Consultores