This website uses cookies by default. These cookies are intended to optimize your browsing experience on this website. By browsing the site you will consent to its use. Please see our Terms of Use and Privacy for more information.

CANAL BRIDGE OF TERÇA

CANAL BRIDGE OF TERÇA
CANAL BRIDGE OF TERÇA

The Canal Bridge of Terça is a part of the Hydro-agricultural Improvement of Sado Valley, transporting the water of Pego do Altar dam for irrigation of about 1700 ha of rice.

Main Characteristics:

  • Total development: 420.00 m
  • Superstructure: prefabricated beams of U section in reinforced and pre-stressed concrete with a maximum width equal to 3.50 m, minimum to 2.20 m and height equal to 1.80 m.
  • Spans: 16 x 25.00 m + 20.00 m
  • Piles : piles with a diameter of 1.00 m and a variable length between 18.0 m on the west side up to about 40.0 near the river, are headed by a chapiter of variable height having its maximum in the connection to the pile of 1.00 m and width equal to 1.20 m, to allow the support of two beams.

Assignment

Detail Design

Download PDF

Work's Value

1,1 Milhões

Date

2000 - 2001

Country

Client

IHERA

Companies

TPF Consultores

Sectors

Share this Project

Share this Project