The Paúl da Serra Wind Farm, located on the Paúl da Serra plateau, consists of 5 wind turbines with 660 kW of unit power and a total installed power of 3.9 MW and an external transformation post, a substation and a command building to install in the Switching Station.
The connection of the park to the power grid is made through a 30 kV power line.
The environmental studies included:
Environmental Monitoring was carried out in the initial exploration phase.
Environmental Impact Study
Environmental Monitoring of the Initial Exploration Phase, Avifauna, Chiropteran, Flora and Vegetation
2003 - 2008
ENEREEM, Energias Renováveis
TPF Consultores