The EIS included the characterization of the reference situation in order to identify and limit sensitive areas of ecological and archaeological point of view/architectural, that could condition the execution of various works, access paths, location of the shipyard, stains, etc.; the identification, prediction and evaluation of positive and negative impacts during the construction, operation and maintenance of the recovery phases, and after its abandonment and decommissioning; and the definition of a set of measures to minimize the negative impacts generated by the construction and operation of the exploitation.
The dam, whose reservoir would have as main use the irrigation, has a crown with 159 m of development and 8 m wide, and its maximum height is 20 m. The total volume of landfill is 112 dam3. The flooded area is 11 ha, allowing a total storage of 0.6 hm3.
Environmental Impact Study
1992 - 1995
DRARO - Direcção Regional de Agricultura do Ribatejo e Oeste
TPF Consultores