Hydroelectrical Central and Pumping Station of Calheta

Hydroelectrical Central and Pumping Station of Calheta
Hydroelectrical Central and Pumping Station of Calheta

This unit, designed for the company Electricidade da Madeira, has a generation capacity of 30 MWe.

The project envisages the optimization of the operation of the electrical network of the island, combining the wind electrical generation with the hydroelectrical generation.

  • In hours of low energy demand the wind turbines supply energy to the pumping station.
  • In hours of huge demand the hydroelectrical station supplies energy to the network.

The systemis formed by the following infrastructures:

  • Upper Reservoir (Dam of Pico da Urze) with a volume of the basin of 1.000.000 m3;
    DIN 1500 conduct, with 3342 m of length and 700m of fall height;
  • Hydroelectrical central and Pumping Station with two Pelton turbines, of 15 MW each, and three main pumps with electrical motors of 5 MW, 6 kV and frequency variator. The primary pumps are of 1 MW.
    • Primary Station, in the body of the Lower Dam;
    • Main Station, in the same building as the hydroelectrical .
  • Internal Reservoir (Calheta dam) with a volume of 67 000 m3.

Assignment

Hydroelectrical Central and Pumping Station:
Design of Architecture, Specialties and Electromechanical Installations.

Dam of Pico da Urze:
Structures, Electrical Installations and Instrumentation Design

Download PDF

Work's Value

50 M€

Date

2010 - 2010

Country

Client

EEM - Empresa de Electricidade da Madeira, S.A.

Companies

TPF Consultores

Nueva Econoler Spain