The Capari WWTP has been designed for an average daily flow of 3456 m3 and for a population of 24,000 inhabitants in the design horizon year. The recommended solution for the WWTP is a system based on aerated lagoons for secondary treatment of the effluent. Two treatment lines are foreseen in terms of aerated lagoons and three treatment lines in terms of sedimentation lagoons.
The project includes a storm water drainage channel developed in conjunction with the WWTP project.
Detailed design.
2017 - 2019
Tecnovia Angola – Sociedade de Empreitadas, LDA
TPF Consultores
TPF Angola